GARLAND ISD - CSP#500-4.1-19 BP4.1 MULTI- CAMPUS RENOVATIONS

Multi-Campus renovations that consists of the renovation of existing restrooms, replacement of original water and sewer piping, and coordination of the owner’s asbestos abatement contractor.

Status

Bidding Closed

Prebid Date9/5/18 9:00 am

Bid Date9/25/18 2:00 pm

Company & Contacts

Garland ISD 2014 Bond Program

VLK Architects, Inc. - Brian Sahrmann   bsahrmann@vlkarchitects.com

Location

Garland, TX

CD included with purchase of complete set. Specs seperated by section and plans by sheet names.

CSP#: 500-4.1-19; BP 4.1
Lakeview Centennial HS (Org 005)
Handley ES (Org 110)
Montclair ES (Org121)
Southgate ES (Org 113)

The Garland Independent School District will be accepting competitive sealed proposals for the renovation work at multiple projects under Bid Package 4.1 (Org#005 Lakeview Centennial HS, Org#110 Handley ES, Org#121 Montclair ES, and Org#113 Southgate ES) until 2:00 p.m. local time, September 25, 2018 at the Garland ISD Purchasing Construction Bond Department, Marvin Padgett Auxiliary Services Center Building; 701 N. First Street; Garland, Texas 75040, where they will be publicly opened and read aloud starting at 2:10 p.m. local time.

Pre-proposal Meeting: September 5, 2018, at 9:00AM, starting at Lakeview Centennial HS, 3505 Hayman Drive; Garland, TX 75043-1920.

The Garland ISD Minimum Safety Program Guidelines Manual may be accessed at:
http://www.garlandisd.net/sites/default/files/general/attach_2-00_7319-gisd_safety_guide-71_pgs.pdf

Budget:$2,037,600