DALLAS ISD - ORG 001 BRYAN ADAMS HS ADDITIONS AND RENOVATIONS

Bryan Adams High School Addition and Renovations

Status

Bidding Closed

Prebid Date1/13/20 10:00 am

Bid Date2/5/20 2:00 pm

Company & Contacts

Dallas ISD 2015 Bond Program

BRW Architects - Abby Hiles   ahiles@brwarch.com

Location

Dallas, TX

CD included with purchase of complete set. Specs seperated by section and plans by sheet names.

HALF SIZE SETS AVAILABLE UPON REQUEST

SCOPE OF WORK:
Scope of Work. The Work consists of:
Org 001 Bryan Adams High School Addition and Renovations
Front Entry Vestibule: A new secure front entry vestibule will be provided at the main entry on Millmar Drive.

Administration and Classroom Addition and Renovations: The Administration and Classroom addition will provide administration office suites, ten core classrooms, associated restrooms, and mechanical spaces.

The existing one-story classroom and administration wing along Millmar Drive will be removed to provide
a new two-story addition. Renovations will also be provided at the existing administration offices suites
and remote assistant principal offices. The existing first floor administrative suites will be renovated to
relocate displaced SPED classrooms provide two additional classrooms.

Fine Arts Addition and Renovations: The Fine Arts Addition includes new Band, Orchestra, Choral, and
Black Box classrooms with associated practice rooms, scene shop, staff offices, and storage. The
existing Band Hall adjacent to the Auditorium will be removed. Renovations will also be provided to the
Performing Arts spaces at the existing Auditorium backstage area to provide dressing rooms and prop
storage.

Athletics Addition and Renovations: The Athletics Addition program includes new 2,000 seat Competition
Gym, Weight Room, Mat Room, and Training Room. The new Gym will serve as the school storm
shelter. The existing north gym will be removed. The Add Alternate Locker Rooms addition includes
locker rooms for Boys Basketball, Boys Team, Girls Basketball, and Girls Volleyball, showers, restrooms,
and Boys and Girls Coach’s Offices. Renovations will be provided at existing locker rooms and
gymnasium and weight room.

Associated sitework will be provided for the new additions including new or relocated site utilities, new fire lane, relocated parking areas, new hardscape and landscaping.

Existing Building Renovations: The Scope of Work includes additional renovations throughout the existing building to address lifecycle and educational adequacy improvements to the following areas: Site and Athletics Fields, Building exterior, Classroom teaching surfaces, Wayfinding signage, Auditorium and Stage, Mechanical, Electrical and Plumbing systems, Fire Alarm, Security and Technology.

BUDGET:
Total for CSP #E001_P0001_3 $ 53,314,925.00

PRE-BID DATE:
A pre-proposal meeting will be held at 10:00 AM on Monday, January 13, 2020 at Bryan Adams
High School (2101 Millmar Drive, Dallas TX 75228) for all interested parties. This meeting is
not mandatory, but information discussed will be very helpful in preparation of the proposal.

BID DATE:
All Construction Services construction procurements must be physically delivered to the Construction
Services office, at 3801 Herschel Ave, Dallas, TX 75219. (Call 972.925.7200 for directions). Delivery to other locations will result in rejection of a CSP.
Completed CSP Package Part 1-A, 1-B and 1-C are due on Wednesday, February 5, 2020 at 2:00 PM
(local time);
Completed CSP Package Part 2 is due on Thursday, February 6, 2020 at 3:00 PM (local time)

BID METHOD:
Competitive Sealed Proposals

A/E Firm Name: BRW Architects
3535 Travis Street, Suite 250
Dallas, TX 75204
Phone 214.528.8704
Email: Abby Hiles ahiles@brwarch.com

Dallas Independent School District Attention: Rose Kohut
Address: 3801 Herschel Ave
City, St, Zip: Dallas, TX 75219
Email: RKohut@dallasisd.org