DALLAS ISD - CSP E193_P0008_3 - JOHN PERSHING ES - ADDITION AND RENOVATION

Competitive Sealed Proposal for Org #193 John Pershing Elementary - Addition and Renovation.

Status

Accepting Bids

Prebid Date9/14/20 10:00 am

Bid Date9/29/20 2:00 pm

Company & Contacts

Dallas ISD 2015 Bond Program

DISD - Rose Kohut   rkohut@dallasisd.org

Location

Dallas, Texas

CD included with purchase of complete set. Specs seperated by section and plans by sheet names.

HALF SIZE SETS AVAILABLE UPON REQUEST

SCOPE OF WORK:
ORG193–John Pershing Elementary –Addition and Renovation-Project consists of the following:

Sitework
1.Regrading, replacement of parking area, playground hard surfaces, sidewalk, and landscape. Provide new marquee sign.

Architecture
•Provide front entry canopy and secure vestibule, replace exterior waterproofing/sealant joints, exterior windows. Exterior surfaces power-washed and paint exterior surfaces. Repair exteriorwall cladding. Provide modified bitumen replacement roof system. Renovation of administration suite. Replace classroom casework. Replace floor finishes, walls and ceilings. Provide gymnasium padding, backboards, goals and supports

Mechanical
•Chiller pumps and HVAC units Replacement supports. Replace IDF/MDF air conditioning and Main Office split system AC units.

Plumbing
•Replace chiller water piping, chilled water pumps, heating water pumps, heating water piping, cold water piping, hot water piping, hose bibs, gas piping, grease waste piping, and waste piping.

Electrical
•Provide exterior LED lighting and controls. Provide interior LED lighting and controls. Replace fire alarmsystem. Replace intercom system.Safety &

Security
•Provide upgraded access control system. Add security screens at first floor windows.

Asbestos Containing Materials Abatement
•Abatement in scope of work areas.

Alternate scope of work
•Replace pavement at Playground area.•HVAC upgrade at main school building.

BUDGET:
Total Estimated Construction Budget (CCL + Allowances) for CSP #E193_P0008_3:$6,458,155.20

PRE-BID DATE:
Pre-Proposal Date & Time: A pre-proposal meeting will be held at 10:00 AM local time on Monday, September 14, 2020 via Join Zoom Meeting for all interested parties

Join Zoom Meeting:

https://us02web.zoom.us/j/88549178646?pwd=WFZ5U0dlNit3dzdmMlN5TVFNNU1Bdz09

Meeting ID: 885 4917 8646

Passcode: EQ2pHB

BID DATE:
All Construction Services construction procurements must be physically delivered to the Construction Services office, at 3801 Herschel Ave, Dallas, TX75219. (Call 972.925.7200 fordirections). Delivery to other locations will result in rejection of a CSP.

Completed CSP Package Part 1-A, 1-B and 1-C aredue on Tuesday, September 29,2020at 2:00 PM(local time);

Completed CSP Package Part 2 is due on Wednesday, September 30, 2020at 3:00 PM(local time)

Any materials received after the respective closing dates/ times will not be considered.

BID METHOD:
Competitive Sealed Proposals

A/E Firm Name: Dimensions Architects
Attention: Oswaldo Cajas
Address:1327 Empire Central Dr. Suite 118
City, State, Zip:Dallas, TX 75247
Fax:866-220-3756
Email: ocajaas@dimarchs.com

Program Manager Firm: Dallas Independent School District
Attention: Rose Kohut
Address: 3801 Herschel Ave
City, St, Zip: Dallas, TX 75219
Email: rkohut@dallasisd.org