DALLAS ISD - CSP E136_P0012_3 - L.O. DONALD ES - ADDITION AND RENOVATION

Competitive Sealed Proposal for L.O. Donald Elementary School - Addition & Renovation

Status

Accepting Bids

Prebid Date9/14/20 2:00 pm

Bid Date9/29/20 2:00 pm

Company & Contacts

Dallas ISD 2015 Bond Program

DISD - Rose Kohut   rkohut@dallasisd.org

Location

Dallas, Texas

CD included with purchase of complete set. Specs seperated by section and plans by sheet names.

HALF SIZE SETS AVAILABLE UPON REQUEST

SCOPE OF WORK:
ORG 136 – L.O. Donald Elementary School – Addition and Renovation – Project consists of the following:

1. Food areas: Additions to Kitchen, and renovations to most of the school cafeteria. Provide kitchen equipment.

2. Site: Landscaping and sidewalk replacement.

3. Building exterior: Replace and provide energy efficient windows, provide security screens, clean
exterior surfaces, paint previously painted exterior surfaces, replace exterior waterproofing/sealant
joints (include all exterior wall control/expansion joints, material transitions, around door and window
frames, wall penetrations, etc.), repair broken and cracked exterior wall cladding and extensive
roofing replacement. Front canopy, secure front vestibule, and building front marquee sign

4. Interior finishes: Most of the flooring, walls, and ceilings. Interior work to include replacing most
casework in classrooms, classroom accessories: marker boards, tack boards, et al, and new room
graphics and way-finding signage.

5. Mechanical improvements to include replacing DDC controls, refrigerant monitoring system, steam
boiler with water heater boiler, heating water pumps VFDs, heating water pumps, chilled water pump VFDs, IDF/MDF air conditioning, rooftop DX units, split system AC units, exhaust fans, condenser pumps VFDs, and washer/dryer connections.

6. Electrical improvements to include exterior lighting controls, replacing lights with LED lighting,
interior electrical includes lighting controls, replacing lights with LED lighting, replace stage lighting,
fire alarm system replacement, and misc. rough-ins.

7. Plumbing improvements to include condenser water pumps, grease waste piping, hose bibs, and
steam piping with hot water piping.

8. Provide required asbestos abatement.

BUDGET:
Total Estimated Construction Budget (CCL + Allowances) for CSP# E136_P0012_3
$10,535,751.45

PRE-BID DATE:
A pre-proposal meeting is scheduled at 2:00 PM local time on Monday, September 14, 2020 via Zoom
Meeting for all interested parties:
Join Zoom Meeting

https://us02web.zoom.us/j/88682954276?pwd=YmFJdjh3TkZGYTVHNEgyMVlqSjdOUT09
Meeting ID: 886 8295 4276
Passcode: 89uVYB

This meeting is not mandatory, but information discussed will be very helpful in preparation of the
proposal.

All general contractors and sub-contractors are encouraged to attend this meeting. Due to the Covid-19
pandemic, there will be no onsite tours for this project solicitation.

BID DATE:
All Construction Services construction procurements must be physically delivered to the Construction Services office, at 3801 Herschel Ave, Dallas, TX 75219. (Call 972.925.7200 for directions). Delivery to other locations will result in rejection of a CSP.

Completed CSP Package Part 1-A, 1-B and 1-C are due on Tuesday, September 29, 2020 2:00 PM local
time.

Completed CSP Package Part 2 is due on Wednesday, September 30, 2020 3:00PM local time.

Any materials received after the respective closing dates / times will not be considered.

BID METHOD:
Competitive Sealed Proposals

**A/E Firm Name:**Page Southerland Page, Inc. (Page/)
Attention: Britt Feik
Address: 1800 Main Street, Suite 123
City, State, Zip: Dallas, Texas 75201
Fax: (214) 522-4380
Email: bfeik@pagethink.com

Program Manager Firm: Dallas Independent School District
Attention: Rose Kohut
Address: 3801 Herschel Ave
City, St, Zip: Dallas, TX 75219
Email: rkohut@dallasisd.org