CITY OF SAN MARCOS - CSP 221-011 - Rio Vista Falls Maintenance Project

The City of San Marcos is seeking a General Contractor to perform maintenance of existing in-stream structures in the San Marcos River at Rio Vista Park, bank stabilization just downstream of the in in-stream structures, and bank repair and stabilization upstream at Dog Beach.
  Addenda 1 (click to expand/collapse)
Name Size
221-011 Addendum No.1 552.0 KB